Loading header...

UNI-T UT333S Split Thermometer with 55cm Long Lead for Test Temperature and Humidity

uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-2
uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-2
uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-1
uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-3
uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-4
uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-5
uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-6
uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-7
uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-9
uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-8

0 out of 5 stars

No review yet
Ready stock
NaN
As low as NaN
Worldwide shipping
ID: MV-240613ADQ7Z5
Weight: 0.70 kg
QtyPriceDiscount
1
NaN
3
NaN
-3.1%
5
NaN
-4.7%
10
NaN
-7.1%

Product details

Description

UNI-T UT333S Split Thermometer with 55cm Long Lead for Test Temperature and Humidity

Features:
  • The UT333S split-type temperature and humidity meter is rugged and versatile and can detect temperature values from -10℃ to 60℃ in various environments
  • Split design, the measurement point, and the reading point are divided during the measurement process to make the reading more efficient
  • LCD backlit display, double temperature and humidity
  • Maximum, and minimum, data retention
  • Automatic shutdown, over-range prompt, low-pressure prompt
  • ℃/℉ unit switching
  • Foreign high-precision temperature and humidity sensing module makes sampling more accurate and reliable
  • Using Japanese TOREX LDO voltage stability control technology, the product consumes less power
  • Can withstand a meter landing impact
  • The probe's split design, 17cm long probe, and unstretched 55cm long leads make it easy to accurately and quickly capture the temperature of a particularly complex environment
  • It is suitable for temperature and humidity measurement in many industries such as factories, laboratories, warehouse management, food hygiene, air conditioning systems, environmental protection, etc. Because it is a split design, it is also applicable to temperature measurements such as narrow and dark ventilation ducts
  • A protective cover is provided outside the sensor to effectively protect the tight parts of the instrument and being damaged by bumps
  • Temperature and humidity double display at a glance
  • Temperature unit switching function Celsius degrees Fahrenheit switching, convenient for users with different needs to view data, with maximum and minimum display, provides a rich and intuitive reading experience
  • Uncover the battery back cover for easy use, put the product panel face down, lift the battery back cover, remove the battery, and install a new battery according to the polarity prompt

Specification:
  • Temperature: -10℃~60℃ ±1.0℃; 14℉~140℉ ±2.0℉
  • Humidity: 0%~100%RH ±5% (20~80%RH)
  • Sampling Time: 1 time second
  • Unit Conversion: ℃/℉
  • Overload Prompt: "OL" prompt
  • Maximum Value: MAX/MIN
  • Data Retention: Yes
  • Backlight: Yes
  • Automatic Shut-down: Yes
  • Low Battery Prompt: Yes
  • Power Supply: 1.5V AAA*3 (Not includes)

Package includes:
  • 1 x Thermometer (without Battery)
uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-2
uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-1
uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-3
uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-4
uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-5
uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-6
uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-7
uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-9
uni t-ut333s-split-thermometer-with-55cm-long-lead-for-test-temperature-and-humidity-8

Customer reviews

0.0/ 5.0
0
0
0
0
0

No customer review yet

Payment methods
Payment methodsPayment methodsPayment methodsPayment methods
Payment methodsPayment methods
Copyright © 2019 - 2025 Martview. All rights reserved.
Version 3.3.0